An arborist and landscaping firm
Report Writing Corpus Built for an Arborist and Landscaping Firm
How an arborist and landscaping firm turned past arborist reports into a writing corpus, then turned their conclusions into guidelines for new drafts.
What Was Built
Past PDF reports became cleaned text. Their conclusions were extracted, sorted by report type, and turned into two style packs that guide removal and supervision report drafts.
What's Provable Today
Nobody measured report drafting time. The corpus holds 434 removal PDFs, 437 cleaned removal reports, 80 supervision PDFs, and 62 cleaned supervision reports, with two guideline packs in use.
From old reports to working guidance
The firm already had years of arborist reports as PDFs. Those files became cleaned text, and the conclusions came out of them next, the part where the arborist explained the finding and the recommended work.
Those conclusions became a guideline corpus. The material was sorted by report type and category before it fed a writing guideline called a style pack.
The removal report corpus
The removal source folder holds 434 report PDFs. After conversion, the cleaned folder holds 437 reports in text form.
The conclusions came out of that text, categorised by the reason behind the recommendation. The resulting corpus then supplied examples for the removal style pack.
The supervision report corpus
A separate source folder holds 80 supervision report PDFs. Its cleaned folder contains 62 reports. That material follows its own path because supervision reports serve a different job from removal reports.
The supervision conclusions became the source for a second style pack. Keeping that guidance separate lets each draft use examples from the right report type.
What a style pack contains
Each style pack turns past conclusions into writing guidelines. The pack gives a draft the patterns and examples drawn from the firm’s report history.
Two finished packs now sit in the guidelines folder. One covers removal reports, while the other covers supervision reports. Both are in use for report writing.
What the figures cover
The source record contains 434 removal PDFs and 80 supervision PDFs. Their cleaned collections hold 437 removal reports and 62 supervision reports. The process produced two style packs from that material.
Nobody measured report drafting time. The corpus counts and the two guideline packs are the results on record.
Want one of these built for your shop?
Book the assessment. We'll go through your paper trail job by job and mark the steps worth handing to a machine.
Book Your Free AssessmentRelated pages
The service behind this build, the trade it serves, and another job like it.
All case studiesService
Workflow Automation for Busy Shops
Built around your current tools, one owned workflow can connect field work, scheduling, invoices, and the records your office needs.
Built for an arborist and landscaping firm
Landscaping Tender Pipeline for Provincial and Municipal Bids
How an arborist and landscaping firm turns a provincial or municipal tender into a priced, cited quote draft that a person certifies before it goes out.
Case study
Field Service ERP for a Fire-Safety Inspection Contractor: Paper Books to a 42,000-File Digital Archive
Years of finished work orders, invoices and quotes sat scattered across filing cabinets, a shared drive of scanned photos, and two Excel workbooks. Nobody could open one client's file and see the whole history in one place. The receivables sheet alone ran north of $1.7 million across roughly 490 rows, with duplicate and hidden rows in it that the client's own staff had stopped trusting.
Case study
Dispatch, Quotes and Invoicing for a Fire-Safety Contractor: How a Phone Call Becomes a Paid Invoice
Dispatch ran through a group chat with no record of who took a job or when. Invoices and quotes came off Excel and Word templates, retyped by hand for every job, with numbering nobody had ever designed. Invoice numbers topped 5,500 in one year and restarted at 2000 the next, and quotes ran three separate numbering blocks at once. The office had no way to promise a customer an arrival window, and no way to see whether an emailed invoice had actually landed.